This was a plant that was shut down during Christmas. We can always work around a client’s schedule! In this job, we removed the furniture from the room, removed existing floor tiles, installed a new epoxy floor system with flakes, painted walls, added a new rubber base, and returned furniture to the rooms. Talk about an upgrade!